Is it possible to clear Development and Stage Environment and copy contents from Live in Umbraco Cloud?

I would like to replace Development and Stage with the contents in Live.
Is this possible?

I don’t have time to clear error and sync these environments, so i need to clear existing items and make a copy of all contents from Live.

Does Umbraco allow that? Is there any solution?


This is a companion discussion topic for the original entry at https://our.umbraco.com/forum/104129-is-it-possible-to-clear-development-and-stage-environment-and-copy-contents-from-live-in-umbraco-cloud